SITE PROFILES

Energy Generated (kWh) to Date
-

Average Wind Speed (mph)
-

Monthly Averages
Temperature (degF)
-
Wind Speed (mph)
-
Power (kW)
-

Monthly Energy Generated (kWh)
-

 

 

 

 

Location:
Hosts:

Kittitas, Washington
Marilynn Carr

Energized:

March 9, 2006

Hardware:

Bergey 10kW Excel turbine; GridTek inverter

Tower:

80' standard guyed tower

Utility:

Puget Sound Energy

Production:

Click here for more detailed graph of energy production

Click here for a wind rose for this site

Click the month below to download time series data from past months:

 

Data coming soon!

Profile:

On March 9, 2006 the eighth Co-op turbine in Washington was energized outside Ellensburg. Dr. Marilynn Carr, a family medicine practitioner, had a nine kilowatt wind-solar hybrid system installed on her property. The unique system powers a back of batteries, with excess production net-metered into the grid.

Dr. Carr's turbine is the first within Puget Sound Energy's service territory. PSE and their customers are supporting OWC by purchasing Green Tags under their Green Power Program.