SITE PROFILES

Energy Generated (kWh) to Date
2584

Average Wind Speed (mph)
9.8

Monthly Averages
Temperature (degF)
-
Wind Speed (mph)
-
Power (kW)
-

July Energy Generated (kWh)
-

 

 

 

 

Location:
Hosts:

White Salmon, Washington
Steve Anderson

Energized:

September 20, 2006

Hardware:

Bergey 10kW Excel turbine; GridTek inverter

Tower:

100' standard guyed tower

Utility:

Klickitat PUD

Production:

Click here for more detailed graph of energy production

Click here for a wind rose for this site

Click the month below to download time series data from past months:

 

Profile:

On September 4, 2006, the tenth turbine of the Co-op was installed near White Salmon, WA. The small wind system’s output will help serve the Anderson household’s electric load. When the system’s output exceeds the home’s electric demand, the excess energy will be delivered to Klickitat County’s electric grid.

"I am participating in this project as a site host because, as owner of Anderson Environmental Contracting, LLC, I practice “environmental conservation” for a living. Generating power for my own use with the wind just makes a lot of sense. I really enjoy being a part of anything that will enhance and improve our environment both now and in the future."